Current Projects

Old Faithful WTP

Rupert WWTP Expansion

WWTP expansion including fine screen equipment, aeration system, blowers, secondary RAS pumps, MBR system, UV system upgrade, Headworks and Fine Screen buildings, retrofitting clarifiers, and new electrical, generator, and HVAC equipment.

Ridenbaugh Canal Headworks

Perform work along the Boise River including demolishing the existing diversion structure, installing temporary cofferdams, and constructing new diversion structures.

Meridian WRRF Tertiary Filtration

Construct a 12.5 MGD Tertiary Filtration Facility with pipelines, equalization, membrane filtration, chemical storage, chemical and membrane buildings, and related work.

Falls Irrigation District Pump Station Rehabilitation

Remove existing pumps, motors, piping, valves, and switchgear. Install new medium voltage switchgear, transformer, piping, and four pumps and motors.