Current
current
Rupert WWTP Expansion
WWTP expansion including fine screen equipment, aeration system, blowers, secondary RAS pumps, MBR system, UV system upgrade, Headworks and Fine Screen buildings, retrofitting clarifiers, and new electrical, generator, and HVAC equipment.
Rupert WWTP Expansion Read More »
Ridenbaugh Canal Headworks
Perform work along the Boise River including demolishing the existing diversion structure, installing temporary cofferdams, and constructing new diversion structures.
Ridenbaugh Canal Headworks Read More »
Meridian WRRF Tertiary Filtration
Construct a 12.5 MGD Tertiary Filtration Facility with pipelines, equalization, membrane filtration, chemical storage, chemical and membrane buildings, and related work.
Meridian WRRF Tertiary Filtration Read More »
Falls Irrigation District Pump Station Rehabilitation
Remove existing pumps, motors, piping, valves, and switchgear. Install new medium voltage switchgear, transformer, piping, and four pumps and motors.
Falls Irrigation District Pump Station Rehabilitation Read More »
MHAFB Water Treatment Plant and Pump Station
Design-Build water treatment plant including a 6 MG water storage tank and liberator pump station to connect to existing distribution systems, process surface water, and distribute the treated water.
MHAFB Water Treatment Plant and Pump Station Read More »
Brundage Infrastructure Phase 1
This multiphase construction project includes the installation of a water and sewer infrastructure, subdivision improvements, entrance road, and a new underground 400,000-gallon water tank and booster pump building.
Brundage Infrastructure Phase 1 Read More »
West Yellowstone WWTP
Construct a new mechanical wastewater treatment plant located within the existing infiltration basin.
West Yellowstone WWTP Read More »
F-35A Squad OPS Facility #6
Design and construction of the new single-story Squadron Operations Facility 6, associated site work, and demolition of Building 904 and two bays of Building 983.
F-35A Squad OPS Facility #6 Read More »
Orr Ditch Boost Pump Station/Hydroelectric Project
Construction, startup and commissioning of new facilities for the purpose of upgrading the existing pump station from submersible to vertical turbine pumps and incorporating hydroelectric power generation facilities.
Orr Ditch Boost Pump Station/Hydroelectric Project Read More »